Project closeout and deficiency checklist

Prepare a construction walkthrough with photos, trade assignments and clear completion status for each deficiency.

Prepare the walkthrough

  • Record the project, walkthrough date and people attending.
  • Choose quick photo capture or a guided checklist.
  • Review the areas and agreed scope you need to inspect.

Record each deficiency

  • Item number / location: ____________________
  • Photo reference: ____________________
  • Type: Painting / Drywall / Tile / Flooring / Plumbing / Electrical / Other.
  • Description of the correction needed: ____________________
  • Assigned subcontractor: ____________________
  • Due date, if agreed: ____________________
  • Status: Open / In Progress / Ready for Review / Complete.

Follow through

  • Add missing descriptions and trade assignments after a photo-only walkthrough.
  • Review the client version and publish it when ready to share.
  • Send each subcontractor the deficiencies assigned to them.
  • Review completed corrections and update item status.
  • Keep the final branded checklist with the project records.

Use it in Fuzed Flow

  • Open Project Closeouts and choose Quick Photo Capture or Guided Walkthrough.
  • Save each photo online, then complete the type, description, assignment and optional due date.
  • Download a branded PDF, publish the checklist for the client or send trade-specific PDF packages.